five

Example task run.

收藏
Figshare2015-12-02 更新2026-04-29 收录
下载链接:
https://figshare.com/articles/dataset/_Example_task_run_/276093
下载链接
链接失效反馈
官方服务:
资源简介:
Example of one task run consisting of one block of each of the four movement tasks. One block of ballistic and stepwise movements consists of 4×5 cycles of flexion-extension and after each 5 cycles there is a short break of 2 seconds (‘+’). One block of steptrack movements consists of 4×10 steptracks, after each 10 steptracks there is a short break (‘+’) of 4 seconds. One block of circle movement consists of alternating cycles (each cycle consists of 10 consecutive circular movements) of counter clockwise (CCW) and clockwise (CW) circles (CCW-CW-CCW-CW-CCW), separated by a short break (‘−’) of 5 seconds. After each block of a movement task there is a rest (‘rest’) period of 35 seconds.
创建时间:
2015-12-02
5,000+
优质数据集
54 个
任务类型
进入经典数据集
二维码
社区交流群

面向社区/商业的数据集话题

二维码
科研交流群

面向高校/科研机构的开源数据集话题

数据驱动未来

携手共赢发展

商业合作