TRINITY DC 02.04.01 New RES plant investment analysis
收藏NIAID Data Ecosystem2026-05-01 收录
下载链接:
https://zenodo.org/record/7950434
下载链接
链接失效反馈官方服务:
资源简介:
This demo aims at testing the capacity of the Dynamic Map cluster of modules of the T-RES CONTROL CENTRE to speed-up and optimize the decision making process for selecting the optimal characteristics for a new RES installation in a given pre-defined location.
This dataset contains replicable cases for the use of the product created in TRINITY, Dynamic Map. The inputs used are the following:
Active power
Reactive power
Technology case
Asset model
Location
Substation
Forecast spot prices
创建时间:
2023-05-20



