five

The parameter estimates, probable range of values, and the critical value at which the optimal strategy changes.

收藏
Figshare2015-12-02 更新2026-04-29 收录
下载链接:
https://figshare.com/articles/dataset/_The_parameter_estimates_probable_range_of_values_and_the_critical_value_at_which_the_optimal_strategy_changes_/1103840
下载链接
链接失效反馈
官方服务:
资源简介:
The optimal strategy using the estimated values was protection. The critical value at which reintroduction resulted in more wild orangutans than protection was calculated by keeping all the other parameters constant at the estimated values, and then varying one parameter to find when the optimal strategy changed. Values were calculated by simulation (although the formula tH≈2CP/d e CR can also be used as an approximation to the critical point). The protection cost has three underlying parameters that were varied; the initial setup cost, the cost per hectare, and the discount rate. For clarity, we have summarized these into variation in the overall protection cost. Hunting was assumed to result in a loss of 0.485% p.a., population growth was 0.75% p.a., and a budget of $5M p.a. was used.awhen the efficiency is e1 * 0.75%.
创建时间:
2015-12-02
5,000+
优质数据集
54 个
任务类型
进入经典数据集
二维码
社区交流群

面向社区/商业的数据集话题

二维码
科研交流群

面向高校/科研机构的开源数据集话题

数据驱动未来

携手共赢发展

商业合作