遇见数据集

File S1 - Identification of Novel AR-Targeted MicroRNAs Mediating Androgen Signalling through Critical Pathways to Regulate Cell Viability in Prostate Cancer

收藏
Figshare2015-12-02 更新2026-04-29 收录
官方服务:

资源简介:

The following information mentioned in manuscript are provided: the detailed information of biological experiments; RT-PCR analysis for genes related to miRNA process; authentic AREs used in this study; pathway enrichment for the 3 miRNAs; ARE location and primers used for ChIP assay; primers used for mRNA RT-PCR analysis; primers used for cloning miRNA target 3′-UTR into luciferase reporter; relationship between intronic miRNAs and host genes; significance of difference in ARE enrichment, and the significance assessment process of Modulation Score. (DOC)

创建时间:
2015-12-02
二维码
社区交流群
二维码
科研交流群
商业服务