An application of Earned Value Management (EVM) with Monte Carlo simulation in engineering project management

收藏
DataCite Commons2025-06-01 更新2024-07-27 收录
下载链接:
https://scielo.figshare.com/articles/An_application_of_Earned_Value_Management_EVM_with_Monte_Carlo_simulation_in_engineering_project_management/9599603/1
下载链接
链接失效反馈
官方服务:
资源简介:
Abstract The fast changes in the Market make companies increasingly focus on project structures. A project differs from a routine activity because it is unique and must be managed and structured to provide expected benefits at no greater cost than anticipated. Therefore, it must be planned and controlled by identifying the deviations between the planned and the accomplished. In order to provide this monitoring, Earned Value Management (EVM) has been increasing accepted. In addition to showing indicators of progress, EVM can be used to forecast the project's final costs through simulated scenarios. This work aims to integrate and apply EVM with Monte Carlo simulation to predict the final costs of three detailed engineering projects, evaluating the performance of the model and the projects, in each specific case study. The results of the three projects simulations were evaluated in a qualitative and comparative way, showing that the integration between the tools generates useful forecasts for project management.
提供机构:
SciELO journals
创建时间:
2019-08-14
5,000+
优质数据集
54 个
任务类型
进入经典数据集
二维码
社区交流群

面向社区/商业的数据集话题

二维码
科研交流群

面向高校/科研机构的开源数据集话题

数据驱动未来

携手共赢发展

商业合作