five

MEX-M-MRS-1-2-3-EXT1-1017

收藏
esdcdoi.esac.esa.int2025-01-21 收录
下载链接:
http://esdcdoi.esac.esa.int/doi/html/data/planetary/MARS-EXPRESS/MEX-M-MRS-1-2-3-EXT1-1017.html
下载链接
链接失效反馈
官方服务:
资源简介:
Data Set Overview The Mars Express (MEX) Radio Science (MaRS) Data Archive is a timeordered collection of raw and partially processed data collected during the MEX Mission to Mars. For more information on the investigations proposed see the MaRS User Manual MARSUSERMANUAL2004 in the MaRS DOCUMENT/MRS_DOC folder. This is a Target Gravity measurement covering the time 20060704T08:10:28.500 to 20060704T08:57:48.500. This data set was collected during the MEX Extended Mission Phase (EXT1) 20062007. This is a Target Gravity on Mars. These kind of measurements were typically conducted during Mars Express pericenter over interesting geophysical structures like Tempe Fossae or Olympus Mons. This particular measurement was conducted over Ascraeus Mons. There were three types of scientific measurements conducted during Extended Mission: Occultation, Bistatic Radar and Gravity where one has to distinguish between global gravity measurements which were conducted around apocenter and target gravity measurements which were conducted around pericenter over interesting geophysical structures. For more information see INST.CAT or the MaRS User Manual MARSUSERMANUAL2004. For all measurements if not indicated otherwise Transponder 1 onboard the s/c was used. Transponder 2 is designed to be a backup. Mission Phase Definition It should be noted that the Mars Express (MEX) Radio Science (MaRS) group uses mission phases which deviate from the ones defined in the MISSION.CAT files given by ESA in order to keep the keywords and abbreviations consistent for Mars Express, and Rosetta. For Venus Express other definitions are used. Those mission phase abbreviations are also used in the data description field of the dataset_id. MaRS mission name | abbreviation | time span Near Earth Verification | NEV | 20030602 20030731 truncated!, Please see actual data for full text [truncated!, Please see actual data for full text]

数据集概览:火星快车号(Mars Express,简称MEX)无线电科学(MaRS)数据档案库是一系列按时间顺序排列的原始数据及部分处理数据,这些数据在火星快车号对火星的任务期间收集。关于提议的调查,请参阅MaRS用户手册MARSUSERMANUAL2004,该手册位于MaRS文档/MRS_DOC文件夹中。本数据集为针对20060704T08:10:28.500至20060704T08:57:48.500时间段的火星目标重力测量。该数据集是在火星快车号扩展任务阶段(EXT1)2006-2007期间收集的。这是一次针对火星的目标重力测量。此类测量通常在火星快车号经过具有研究价值的地质结构,如泰姆佩凹地或奥林帕斯山时进行。此次特定测量是在阿斯克拉厄斯山进行的。在扩展任务期间,共进行了三种科学测量:掩星、双站雷达和重力。需要区分全球重力测量,这些测量在远地点附近进行,以及目标重力测量,这些测量在近日点附近针对具有研究价值的地质结构进行。更多信息请参见INST.CAT或MaRS用户手册MARSUSERMANUAL2004。除非另有说明,所有测量均使用搭载在航天器上的应答器1进行。应答器2设计为备份。任务阶段定义:需要注意的是,火星快车号(MEX)无线电科学(MaRS)小组使用的任务阶段与ESA提供的MISSION.CAT文件中定义的任务阶段有所不同,以保持火星快车号、罗塞塔号的关键词和缩写的一致性。对于金星快车号,则使用其他定义。这些任务阶段的缩写也用于dataset_id的数据描述字段中。MaRS任务名称 | 缩写 | 时间范围 近地验证 | NEV | 2003年6月2日至2003年7月31日,截断!请参阅实际数据以获取完整文本[截断!请参阅实际数据以获取完整文本]
提供机构:
European Space Agency
5,000+
优质数据集
54 个
任务类型
进入经典数据集
二维码
社区交流群

面向社区/商业的数据集话题

二维码
科研交流群

面向高校/科研机构的开源数据集话题

数据驱动未来

携手共赢发展

商业合作