Survey Report from Casey Station 2024/2025
收藏Research Data Australia2025-12-20 收录
下载链接:
https://researchdata.edu.au/survey-report-casey-station-20242025/3757402
下载链接
链接失效反馈官方服务:
资源简介:
Survey summary of works during surveying fieldwork at Casey Station 22 December 2024 – 4 January 2025 as part of round trip Voyage 2 for Project 5202.Surveys conducted:• Completed audit of survey control within extended station limits. Surveyed existing ground control – confirmed more survey control near wharf (additional to 2023/2024 Survey)• RPA (drone) lidar and imagery capture of station and extents. • Terrestrial laser scans of station infrastructure o Tank house, o container medical facility, o old waste water treatment building, o outside scan of upper station, as a skeleton survey for further internal scans. These scans compliment previous work conducted in 2023/2024 season.• Survey of proposed new mast location options in ASPA 135• Survey equipment installed on station, storage location confirmed and battery management programme initiated.Data summary:2025 Casey station survey report documentAUSPOS - RINEX and Geoscience Australia GPS Processing Reports of static observationsCAD file - 20250123 Casey Survey ITRF2000 UTMZ49S MSL.dwg (autocad format)Photographs - jpg format for clarity of ASPA135, survey control, surveying equipment, and terrestrial laser scanningPoint Listing- casey survey points ITRF 2000 UTMZ49S MSL csv format
提供机构:
Australian Antarctic Division



