five

Survey Report from Casey Station 2024/2025

收藏
Research Data Australia2025-12-20 收录
下载链接:
https://researchdata.edu.au/survey-report-casey-station-20242025/3757402
下载链接
链接失效反馈
官方服务:
资源简介:
Survey summary of works during surveying fieldwork at Casey Station 22 December 2024 – 4 January 2025 as part of round trip Voyage 2 for Project 5202.Surveys conducted:•    Completed audit of survey control within extended station limits. Surveyed existing ground control – confirmed more survey control near wharf (additional to 2023/2024 Survey)•    RPA (drone) lidar and imagery capture of station and extents. •    Terrestrial laser scans of station infrastructure o    Tank house, o    container medical facility, o    old waste water treatment building, o    outside scan of upper station, as a skeleton survey for further internal scans. These scans compliment previous work conducted in 2023/2024 season.•    Survey of proposed new mast location options in ASPA 135•    Survey equipment installed on station, storage location confirmed and battery management programme initiated.Data summary:2025 Casey station survey report documentAUSPOS - RINEX and Geoscience Australia GPS Processing Reports of static observationsCAD file - 20250123 Casey Survey ITRF2000 UTMZ49S MSL.dwg (autocad format)Photographs - jpg format for clarity of ASPA135, survey control, surveying equipment, and terrestrial laser scanningPoint Listing- casey survey points ITRF 2000 UTMZ49S MSL csv format
提供机构:
Australian Antarctic Division
5,000+
优质数据集
54 个
任务类型
进入经典数据集
二维码
社区交流群

面向社区/商业的数据集话题

二维码
科研交流群

面向高校/科研机构的开源数据集话题

数据驱动未来

携手共赢发展

商业合作