遇见数据集

Mrs.

收藏
Mendeley Data2021-01-19 更新2026-04-09 收录
官方服务:

资源简介:

There are 15 instances for hybrid flow-shop scheduling problem with unrelated machine, each instance has five processing stages. The files name are also the name of the instances, for each instance file, there are many lines to describe the processing. The row with two data shows the processing stage and the number of processing equipment in this stage.The row with two data indicates the processing stage and the number of processing equipment in this stage. According to the number of processing equipment in this stage, the processing data corresponding to the number of rows will follow. One line describes the processing data of one equipment. Data in accordance with the processing time, unit energy consumption to explain the processing of each workpiece in this stage. The last two data of this line show the unit standby energy consumption and on-off energy consumption of this equipment.For more detailed description, please look instance file j15c5a1.txt.

本数据集共包含15个带无关机器的混合流水车间调度问题(hybrid flow-shop scheduling problem with unrelated machine)实例,每个实例均涵盖5道加工工序。文件名称与对应实例的名称完全一致,各实例文件均包含若干行加工相关描述信息。含两个数据的行用于标注加工工序编号与该工序的加工设备总台数。根据该工序的加工设备数量,后续将紧随对应行数的加工数据行,每一行用于描述单台设备的加工数据。该行数据依次说明各工件在该工序下的加工时间与单位能耗;该行末尾的两个数据分别为该设备的单位待机能耗与启停能耗。如需获取更详细的描述,请查阅实例文件j15c5a1.txt。

创建时间:
2021-01-19
二维码
社区交流群
二维码
科研交流群
商业服务