Factors responsible for cost overruns dataset
收藏DataCite Commons2024-09-30 更新2025-04-09 收录
下载链接:
https://esango.cput.ac.za/articles/dataset/Factors_responsible_for_cost_overruns_dataset/26880157
下载链接
链接失效反馈官方服务:
资源简介:
clearance Certificate No | 2023_FBMSREC_ST20The data uploaded is the raw data collected from the survey sent out to the industry. The survey was compiled to determine the factors responsible for cost overruns within the manufacturing industry.
创建时间:
2024-09-30



