five

Tote Road Pike Lakes restoration: northern pike eradication

收藏
Mendeley Data2024-04-12 更新2024-06-29 收录
下载链接:
https://datadryad.org/stash/dataset/doi:10.5061/dryad.c866t1g3p
下载链接
链接失效反馈
官方服务:
资源简介:
Water quality data was collected with a Quanta Hydrolab. Water quality measurements were collected in one-meter water increments from the lake bottom to lake surface. Water quality was collcted from each lake on a quasi-monthly basis for one year before and one year after the rotenone treament of each lake. Calibration of the Hydrolab was done according to the manufacturer's guidelines. Gillnetting and fish sampling data was collected during northern pike and muskelluenge removal activities in 2018 and also from gillnettting in 2019 done to verify the success of invasive fish eradication attempts via rotenone treatment. Gillnets were variable mesh gillnets paneled with six 20-foot sections of three-quarter in, 1 in, 1¼ in, 1½ in, 1¾ in, and 2 in stretch monofilament mesh. Fish lengths were measured from fork-of-tail to tip-of -snout. Some fish caught in the spring of 2018 were sampled for spawning condition and sex identificatiion based on morphological traits observed during dissection. All data was manually entered into Microsoft Excel files then error-checked for typos and out-of-range values before converting to .csv file format.
创建时间:
2023-06-28
二维码
社区交流群
二维码
科研交流群
商业服务