five

Optimal Reinsertion of Cancelled Train Lines

收藏
DataCite Commons2020-08-01 更新2024-07-03 收录
下载链接:
https://journals.aau.dk/index.php/utd/article/view/3718
下载链接
链接失效反馈
官方服务:
资源简介:
One recovery strategy in case of a major disruption in a rail network is to cancel all trains on a specific line of the network. When the disturbance has ended, the cancelled line must be reinserted as soon as possible. In this article we present a mixed integer programming (MIP) model for calculating the best way to reinsert cancelled train lines in a rail network covered by a periodic timetable. Using a high abstraction level it has been possible to incorporate the temporal aspect in the model only relying on the information embedded in the train identification numbers of each departure. The model finds the optimal solution in an average of 0.5 CPU seconds in each test case.
提供机构:
Selected Proceedings from the Annual Transport Conference at Aalborg University
创建时间:
2020-04-30
5,000+
优质数据集
54 个
任务类型
进入经典数据集
二维码
社区交流群

面向社区/商业的数据集话题

二维码
科研交流群

面向高校/科研机构的开源数据集话题

数据驱动未来

携手共赢发展

商业合作