Remote Online Measurement and Monitoring of Electric Vehicle Charging Piles on June 12, 2025
收藏DataCite Commons2025-06-26 更新2026-05-05 收录
下载链接:
https://www.scidb.cn/detail?dataSetId=a8076c63808a4e27b8542e48f2a7dc23
下载链接
链接失效反馈官方服务:
资源简介:
Dataset information: necessary calibration information, calibration plan, calibration environment temperature and humidity and standard equipment, appearance function inspection, calibration work error, clock time error, calibration results. Necessary information for verification: charging station information, nameplate, manufacturer, production time, installation time. Verification plan: Verification methods (pulse method, indication method), voltage, current. Verify environmental temperature and humidity with standard devices: environmental temperature, environmental humidity, name of standard device, range of standard device quantity, standard level of standard device, certificate number of standard device, and validity period of standard device. Appearance function inspection: appearance inspection items, verification address, appearance photos. Verification work error: current (A), voltage (V), standard value (kWh), verified value (kWh), error (%), average error (%), charging energy (kW). Clock time error: clock photo, standard time, tested time, error (S). Verification results: appearance function inspection status, working error status, clock time error status, verification results, verification logs, verification certificates, original records.
提供机构:
Science Data Bank
创建时间:
2025-06-26



