five

The effects of including timber opportunity costs on total costs.

收藏
Figshare2015-12-02 更新2026-04-29 收录
下载链接:
https://figshare.com/articles/dataset/_The_effects_of_including_timber_opportunity_costs_on_total_costs_/410355
下载链接
链接失效反馈
官方服务:
资源简介:
BD + ES as Targeted Benefits and BD + ES Hybrid A have identical parameters except for the cost surface. The two Marxan-selected networks represent the same levels of recreational angling and carbon storage values, but they have different costs. Each performs more efficiently by the costs of its own cost surface (BD + ES Targeted Benefits was run with a cost surface including timber values, while Hybrid A was run only with the suitability index).
创建时间:
2015-12-02
5,000+
优质数据集
54 个
任务类型
进入经典数据集
二维码
社区交流群

面向社区/商业的数据集话题

二维码
科研交流群

面向高校/科研机构的开源数据集话题

数据驱动未来

携手共赢发展

商业合作