The effects of including timber opportunity costs on total costs.
收藏Figshare2015-12-02 更新2026-04-29 收录
下载链接:
https://figshare.com/articles/dataset/_The_effects_of_including_timber_opportunity_costs_on_total_costs_/410355
下载链接
链接失效反馈官方服务:
资源简介:
BD + ES as Targeted Benefits and BD + ES Hybrid A have identical parameters except for the cost surface. The two Marxan-selected networks represent the same levels of recreational angling and carbon storage values, but they have different costs. Each performs more efficiently by the costs of its own cost surface (BD + ES Targeted Benefits was run with a cost surface including timber values, while Hybrid A was run only with the suitability index).
创建时间:
2015-12-02



