five

Roundabout in a Minute

收藏
DataCite Commons2025-12-18 更新2025-04-16 收录
下载链接:
https://purr.purdue.edu/publications/2283/1
下载链接
链接失效反馈
官方服务:
资源简介:
<p>[[Video(http://www.youtube.com/watch?v=WkoIPDd5_TQ)]]</p> <p>The construction of the roundabout shown in this video is part of a $350,000,000 project that upgrades and grade-separates 13 miles of US 31 between I-465 and Indiana State Road 38. The upgraded 13-mile stretch features 11 new interchanges and eliminates 32 traffic signals. Construction on the roundabout began in June 2015 and was complete by October 2015, while the overall project was substantially complete by December 2015. This video shows a 3-month time-lapse of the construction of the roundabout interchange at 191st Street in 1 minute.</p> <p>This project is located at <a href="https://www.google.com/maps/@40.0646726,-86.1280184,461a,20y,2.8t/data=!3m1!1e3">40.0646726,-86.1280184</a>.</p>
提供机构:
Purdue University Research Repository
创建时间:
2016-11-18
5,000+
优质数据集
54 个
任务类型
进入经典数据集
二维码
社区交流群

面向社区/商业的数据集话题

二维码
科研交流群

面向高校/科研机构的开源数据集话题

数据驱动未来

携手共赢发展

商业合作