Data from: Higher resource level promotes virulence in an environmentally transmitted bacterial fish pathogen
收藏资源简介:
Bacterial growth dataBacterial densities as colony forming units per milliliter of a high-virulence strain B067 (A) and a low-virulence strain B398 (B) of Flavobacterium columnare at different levels of nutrient enrichment in sterile tap water. The volumes of nutrient medium at each nutrient level (baseline, low and high) are expressed .Growth data.xlsxBacterial virulence dataSurvival (h) of zebra fish (Danio rerio) and rainbow trout (Oncorhynchus mykiss) infected with the high-virulence strain (B185), low-virulence strain (B398) or the high-virulence strain (B067) of F. columnareVirulence data.xlsx
细菌生长数据集:涵盖无菌自来水中不同营养富集水平下,柱状黄杆菌(Flavobacterium columnare)高毒力菌株B067(A组)与低毒力菌株B398(B组)的菌落形成单位每毫升密度数据。各营养水平(基线、低、高)下的营养培养基体积已标注说明。(数据文件:Growth data.xlsx) 细菌毒力数据集:记录了感染柱状黄杆菌(F. columnare)高毒力菌株B185、低毒力菌株B398及高毒力菌株B067后,斑马鱼(Danio rerio)与虹鳟(Oncorhynchus mykiss)的存活时长(小时)。(数据文件:Virulence data.xlsx)



