These cases are the cases in paper An integrated flexible job shop scheduling and assembly sequence planning approach under limited resources for mixed-production considering transportation task using
Pareto fronts (PF) found by a parallel Branch and bound. The data was obtained by a parallel branch-and-bound with shared memory architecture. A total of 24 threads were used with a time limit of 120