遇见数据集

Cost-efficiency summary for each location.

收藏
NIAID Data Ecosystem2026-03-12 收录
官方服务:

资源简介:

Maximum discharge reduction (as a percentage of initial runoff), total cost of the installation of the different solutions in the entire city and effectiveness (ratio between total costs and maximum discharge reduction).

创建时间:
2021-01-29
二维码
社区交流群
二维码
科研交流群
商业服务