Soil Logs, grain size analysis, and water quality measurements at West Fork Hoquiam River Dam Removal and Groundwater Replacement Preliminary Design and Permitting project from 2024-04-29 to 2024-10-15 (NCEI Accession 0306762)
收藏DataCite Commons2026-01-27 更新2026-05-04 收录
下载链接:
https://www.ncei.noaa.gov/archive/accession/0306762
下载链接
链接失效反馈官方服务:
资源简介:
Drilling of the exploratory boreholes and installation of the monitoring well was completed by Anderson Environmental Contracting, LLC (AEC), using sonic drilling methods. An Aspect geologist was on-Site to observe the drilling and characterize the samples under the direction of a Washington State-licensed hydrogeologist (LHG). Aspect logged the borehole in general accordance with ASTM International (ASTM) Method D2488, Standard Practice for Description and Identification of Soils (Visual-Manual Procedure). To confirm the soil type of the shallow aquifer, Aspect submitted a representative soil sample to Hayre McElroy & Associates of Redmond, Washington, for laboratory analysis of grain-size distribution.
In addition, water quality samples were taken from the TW-01 to categorize the shallow aquifer water quality at the site. These water quality samples were sent to Fremont Analytical, Inc of Seattle, Washington, for laboratory analysis.
提供机构:
NOAA National Centers for Environmental Information
创建时间:
2026-01-26



