遇见数据集

Summary of endophyte effect, transmission rates and prevalence values in F.eskia under two resource levels.

收藏
Figshare2015-12-03 更新2026-04-29 收录
官方服务:

资源简介:

Growth rates were obtained from the model A, the overall endophyte transmission were measured in the field, the endophyte prevalence were returned by the model B and the threshold in transmission below which the symbiont frequency in the population was zero were obtained by simulations. TA transmission rate from adult to seed, TS transmission rate from seedling to juvenile.

创建时间:
2015-12-03
二维码
社区交流群
二维码
科研交流群
商业服务