The topographic Aspect grid represents the angle of aspect of the seabed in the Darwin Harbour survey area. The Aspect grid was created from the bathymetry grid of Darwin Harbour obtained from the sur
In February 2017, the Grand River Dam Authority filed to relicense the Pensacola Hydroelectric Project with the Federal Energy Regulatory Commission. The predominant feature of the Pensacola Hydroelec
The Crowdy Head Offshore, NSW, multibeam survey was acquired by the NSW government (Department of Planning and Environment – DPE) onboard the Research Vessel Bombora during the...