five

A NEW MATHEMATICAL MODEL FOR THE WORKOVER RIG SCHEDULING PROBLEM

收藏
DataCite Commons2022-06-02 更新2024-07-29 收录
下载链接:
https://scielo.figshare.com/articles/dataset/A_NEW_MATHEMATICAL_MODEL_FOR_THE_WORKOVER_RIG_SCHEDULING_PROBLEM/19967707/1
下载链接
链接失效反馈
官方服务:
资源简介:
ABSTRACT One of the most important activities in the oil and gas industry is the intervention in wellsfor maintenance services, which is necessary to ensure the constant production of oil. These interventions are carried out by workover rigs. Thus, the Workover Rig Scheduling Problem (WRSP) consists of finding the best schedule to service the wells while considering the limited number of rigs with the objective of minimizing the total production loss. In this study, a 0-1 integer linear programming model capable of efficiently solving the WRSP with a homogeneous fleet of rigs is proposed. Computational experiments were carried out using instances based on real cases in Brazil to compare the results obtained by the proposed model with the results reported by other methods. The proposed model was capable of solving all instances considered in a reduced computational time, including the large instances for which only approximatesolutions were presently known.
提供机构:
SciELO journals
创建时间:
2022-06-02
5,000+
优质数据集
54 个
任务类型
进入经典数据集
二维码
社区交流群

面向社区/商业的数据集话题

二维码
科研交流群

面向高校/科研机构的开源数据集话题

数据驱动未来

携手共赢发展

商业合作