Switching Substation Load Profile
收藏官方服务:
资源简介:
Users should note that readings are indicative of the measured Mega Volt-Ampere readings which have not been corrected for temporary load shifts due to operational requirements or load fluctuations due to load shedding.
提供机构:
City of Cape Town创建时间:
2026-02-28



