Movhera - Elétricas do Norte, S.A. Foz-Tua: Fishes – Ecological Monitoring Program [2021-2023]
收藏www.gbif.org2023-07-21 更新2025-03-24 收录
下载链接:
https://www.gbif.org/dataset/6a81df65-caf7-468d-a265-03bc774da71f
下载链接
链接失效反馈官方服务:
资源简介:
The dataset contains records of Fishes (Pisces) collected in the River Tua and its tributaries within the Ecological Monitoring Program (2021-2023) of the Exploration Phase of the Foz Tua Hydroelectric Dam, initially promoted by EDP – Energias de Portugal, S.A., subsequently (2021) transferred to Movhera Hidroelétricas do Norte, S.A. Data were collected in the spring/summer of 2021 to 2023 in 16 sampling stations distributed along the river Tua and its main tributaries (14 in lothic system and 2 in lenthic system), from the mouth to about 52 km upstream. The Ecological Monitoring Program (2021-2025) aims to evaluate the impacts of dam construction in the water quality of the river, after the construction process. The two lenthic stations were also used to assess water quality (biologic parameters),within the scope of the EU’s Water Framework Directive.
该数据集收录了在图阿河及其支流中采集的鱼类(硬骨鱼纲)记录,这些采集活动是在图阿水电站勘探阶段生态监测计划(2021-2023年)的框架下进行的,该计划最初由葡萄牙能源公司EDP – Energias de Portugal, S.A.推动,并在2021年后转由Movhera Hidroelétricas do Norte, S.A.负责。数据采集于2021年至2023年的春季/夏季,在图阿河及其主要支流上分布的16个采样站进行(其中14个位于洛蒂克系统,2个位于伦蒂克系统),范围从河口向上游约52公里。生态监测计划(2021-2025年)的目的是评估水电站建设对河流水质的影响,尤其是在建设过程之后的状况。两个伦蒂克系统的采样站也被用于评估水质(生物参数),此评估在欧盟水框架指令的范围内进行。
提供机构:
www.gbif.org



