five

Ding Darling National Wildlife Refuge - Greater Everglades Baseline Information and Response to CERP

收藏
DataONE2016-10-29 更新2024-06-26 收录
下载链接:
https://search.dataone.org/view/c025326d-9915-4922-8f7a-b7e824ca40fd
下载链接
链接失效反馈
官方服务:
资源简介:
The greater Everglades Restoration program includes a management plan for the C-43 Canal, or Caloosahatchee River. This plan affects the quantity, quality, and timing of freshwater releases at control structure S-79 at Franklin Locks. Freshwater contributions are from Lake Okeechobee, and farming runoff along the canal from Lake Okeechobee to the town of Alva. This study will provide basic information on the effects on the quality of water entering J. N. Ding Darling National Wildlife Refuge as the result of freshwater releases at control structure S-79.
创建时间:
2016-10-29
二维码
社区交流群
二维码
科研交流群
商业服务