five

Maximum-likelihood and Bayesian time estimates for the nodes (Mya) (Fig 4).

收藏
Figshare2015-12-03 更新2026-04-29 收录
下载链接:
https://figshare.com/articles/dataset/_Maximum_likelihood_and_Bayesian_time_estimates_for_the_nodes_Mya_Fig_4_/1537951
下载链接
链接失效反馈
官方服务:
资源简介:
a: Cannot be calculated due to the lack of the DNA sequence of the Daphnia pulex RPB2 (EFX81055)b: Posterior mean (95% HPD)Maximum-likelihood and Bayesian time estimates for the nodes (Mya) (Fig 4).
创建时间:
2015-12-03
二维码
社区交流群
二维码
科研交流群
商业服务