遇见数据集

Interacting effects of predation risk and resource level on escape speed of amphibian larvae along a latitudinal gradient

收藏
DataONE2020-06-24 更新2024-06-08 收录
官方服务:

资源简介:

Fast-growing genotypes living in time-constrained environments are often more prone to predation, suggesting that growth-predation risk trade-offs are important factors maintaining variation in growth along climatic gradients. However, the mechanisms underlying how fast growth increases predation-mediated mortality are not well understood. Here, we investigated if slow-growing, low-latitude individuals have faster escape swimming speed than fast-growing high-latitude individuals using common frog (Rana temporaria) tadpoles from eight populations collected along a 1500 km latitudinal gradient. We measured escape speed in terms of burst and endurance speeds in tadpoles raised in the laboratory at two food levels and in the presence and absence of a predator (Aeshna dragonfly larvae). We did not find any latitudinal trend in escape speed performance. In low food treatments, burst speed was higher in tadpoles reared with predators but did not differ between high food treatments. Endurance s...

创建时间:
2025-03-31
二维码
社区交流群
二维码
科研交流群
商业服务