ERCOT Bat Cave BESS Independent Audit (US-TX-BATC-001)
收藏官方服务:
资源简介:
Independent verification of the public nameplate claims of the Bat Cave battery energy storage system (BATCAVE_ESR1, Mason County, TX) — 100 MW / 100 MWh — from ERCOT SCED 60-day telemetry, under the VolMax P10 Verification Protocol. Power capacity (F1): Not Demonstrated (peak output: 72.61 MW). Energy capacity (F2): Not Demonstrated (largest continuous discharge: 58.0 MWh). SoC telemetry consistency (F3): Inconsistent (1.22% pass rate; mean consistency ratio: 0.6339). SoC field interpretation (F4): Deferred.
提供机构:
Zenodo创建时间:
2026-07-17



