5.1.1 in Additional Assessment Report - Crucea North Wind Farm 99 MW
收藏官方服务:
资源简介:
5.1.1 Booted Eagle Flight Activity (i) VP(ii) Visible Area (ha)(iii) Watch Time Nov – Sept (hrs)(iv) Watch Time hahr (ii) x (iii)(v) Flying Time 30-150m (hrs)(vi) Flight Time 30-150m per ha/hr (v)/(iv)11413.94867867.20021413.94867867.20.0375 (135)5.53 x 10 -731413.94867867.200Total203601.60.0375 (135s)Overall1.84x 10 -7
创建时间:
2025-11-27



