five

Area of the PLU of the municipality of Mareuil-Caubert

收藏
data.europa2024-06-25 收录
下载链接:
https://data.europa.eu/data/datasets/56ec149e88ee380c03e1a62c?locale=en
下载链接
链接失效反馈
官方服务:
资源简介:
The Code de l' urbanism defines four types of areas regulated in the local plan of #x27; urban planning (R.123-5 to 8): urban areas (U), urban areas (AU), agricultural areas (A) and natural and forest areas (N). These areas are delimited on one or more graphic documents. A settlement is attached to each zone. The regulation may lay down different rules, depending on whether the purpose of the constructions concerns the habitation, l' hotel accommodation, offices, commerce, l' handicrafts, l' industry, l' agricultural or forestry operations or the function of #x27; warehouse. These categories are limited (Article R.123-9).The already urbanised sectors where the existing or under construction public facilities have sufficient capacity to serve the buildings to be installed may be classified into AU zones, the natural areas of the municipality intended to be opened to the outskirts or not, depending on whether or not the existing equipment on the periphery is sufficient to serve the constructions to be installed. There are two types of AU zone: areas AU ‘constructible’ and ‘inconstructible’ AU areas.Can be classified as zones A, sectors of the municipality, equipped or not, to be protected because of the agronomic, biological or economic potential of agricultural land.Can be classified as N areas, the areas of the municipality equipped or not, to be protected either because of the quality of the sites, natural environments, landscapes and their interest, in particular, from an aesthetic, historical or ecological point of view, either from the point of view of the existence of a forest, a forest exploitation or its character of natural areas.- In the N zones, within the N zones, may be delimited: perimeters in which the possibility of transferring the right to build can be carried out (transfer of COS),- sectors of limited size and capacity where construction is possible under condition of ' implantation and density. __Origin__ Source of data: The 4 PPRIs, 10 PPRMTs, 148 Prefectural Orders R 111-3 Underground Cavities and X Prefectural Orders R 111-3 Floods of the Yvelines were instituted by prefectural decrees.The digitisation of the data was carried out by DDT78/DIR/MGI/SI.The benchmarks used are the vector Parcellar BD and the BD Parcellaire image supplemented by the Ortho BD, all carried out in accordance with the methodology for digitisation “Servitude PM1” of the Ministry of Ecology. __Partner organisations__ DDTM Somme __Links annexes__ * [XML metadata view](http://ogc.geo-ide.developpement-durable.gouv.fr/csw/all-dataset?REQUEST=GetRecordById&SERVICE=CSW&VERSION=2.0.2&RESULTTYPE=results&elementSetName=full&TYPENAMES=gmd:MD_Metadata&OUTPUTSCHEMA=http://www.isotc211.org/2005/gmd&ID=fr-120066022-jdd-84772758-1f41-4bbc-82b6-c76ea4a8244b) * [COVADIS data standard: Zoning for Class PM1 easements (Predictable Natural Risk Prevention or Mining)(http://geostandards.developpement-durable.gouv.fr/afficherPageStandard.do?jeu=N_PM1_ASSIETTE_SUP_S) [See this page on geo.data.gouv.fr](https://geo.data.gouv.fr/fr/datasets/44dde7fb72744187988ba34542e4cce263980de9)
二维码
社区交流群
二维码
科研交流群
商业服务