five

Equipment Selection of Hydraulic Fracturing Hard Roof in Fully Mechanized Face at Initial Mining data.docx

收藏
DataCite Commons2020-08-26 更新2024-07-27 收录
下载链接:
https://figshare.com/articles/Equipment_Selection_of_Hydraulic_Fracturing_Hard_Roof_in_Fully_Mechanized_Face_at_Initial_Mining_data_docx/8866418
下载链接
链接失效反馈
官方服务:
资源简介:
16 hydraulic fracturing holes were designed in 1310 fully mechanized mining face. Each hydraulic fracturing hole features with the 50~55°between drilling holes and horizontal plane, the vertial side wall of roadway, the distance between drilling holes as 10m and the depth of drilling holes as 30m. Each borehole is sealed firstly from the bottom and conducted hydraulic fracturing three times with every 3 m intervals. The sealing pressure of sealing hole pump injecting clean water into the Hole-pacher is 13-14 MPa. The criterion for the end of hydraulic fracturing is that the water gushing around the hydraulic fracturing holes (boreholes) can be seen or the fracturing sound of the roof being pre-cracked can be heard. During construction, the flow rate of the three-plunger pump ranges from 15.3 to 20.2 L/min.
提供机构:
figshare
创建时间:
2019-07-16
5,000+
优质数据集
54 个
任务类型
进入经典数据集
二维码
社区交流群

面向社区/商业的数据集话题

二维码
科研交流群

面向高校/科研机构的开源数据集话题

数据驱动未来

携手共赢发展

商业合作