RAPID: Group Effects on Pile Downdrag Following Liquefaction
收藏Mendeley Data2024-06-05 更新2024-06-27 收录
下载链接:
https://www.designsafe-ci.org/data/browser/public/designsafe.storage.published/PRJ-4661/#details-8914766816762326545-242ac118-0001-012
下载链接
链接失效反馈官方服务:
资源简介:
A total of 14 instrumented piles were driven into a liquefiable sand deposit. The piles were driven in two pile groups. One pile group consisted of seven closed ended pipe piles (18-inch diameter, 74-feet long) and the other pile group consisted of seven H-piles (HP 14x102, 90-feet long).
创建时间:
2024-05-10



