RAPID: Group Effects on Pile Downdrag Following Liquefaction
收藏数据链接:
官方服务:
资源简介:
A total of 14 instrumented piles were driven into a liquefiable sand deposit. The piles were driven in two pile groups. One pile group consisted of seven closed ended pipe piles (18-inch diameter, 74-feet long) and the other pile group consisted of seven H-piles (HP 14x102, 90-feet long).