RAPID: Group Effects on Pile Downdrag Following Liquefaction

收藏
Mendeley Data2024-06-05 更新2024-06-27 收录
官方服务:

资源简介:

A total of 14 instrumented piles were driven into a liquefiable sand deposit. The piles were driven in two pile groups. One pile group consisted of seven closed ended pipe piles (18-inch diameter, 74-feet long) and the other pile group consisted of seven H-piles (HP 14x102, 90-feet long).

共计14根传感桩(instrumented piles)被打入可液化砂层中,且分为两个桩组布设:其中一组包含7根闭口管桩(直径18英寸,桩长74英尺),另一组包含7根H型钢桩(型号HP 14x102,桩长90英尺)。