five

Melbourne Metro Tunnel Project Future Station Entrances

收藏
Research Data Australia2024-12-14 收录
下载链接:
https://researchdata.edu.au/melbourne-metro-tunnel-station-entrances/2167683
下载链接
链接失效反馈
官方服务:
资源简介:
This point layer represents the location of future station entrances for North Melbourne (Arden) Station, part of the Melbourne Metro Tunnel Project. The Concept Design shown in this data reflects the indicative design shown in the Project's Environmental and Effects Statement (EES) which was publicly circulated with the community in May 2016.\n\nThe Metro Tunnel Project comprises two twin 9 kilometre tunnels with five new underground stations, including two city stations directly connected to Flinders Street and Melbourne Central. It will connect the Sunbury and Cranbourne / Pakenham lines for the first time, creating a new end-to-end train line through the inner city. Construction of the Metro Tunnel began in 2017 and it is due to be completed by 2026.\n\nThe Metro Tunnel Project comprises various works packages. As the project progresses and designs are further developed and approved, an updated dataset will be made available.

本点图层用于展示墨尔本地铁隧道项目(Melbourne Metro Tunnel Project)下属北墨尔本(阿登)站(North Melbourne (Arden) Station)的未来出入口点位。本数据所载的概念设计,与该项目2016年5月面向公众公示的《环境影响声明》(Environmental and Effects Statement, EES)中的示意性设计方案一致。 墨尔本地铁隧道项目包含两条总长9公里的双孔隧道,以及五座新建地下车站,其中两座城市接驳车站可直接连通弗林德斯街站(Flinders Street)与墨尔本中央站(Melbourne Central)。该项目将首次实现桑伯里线(Sunbury Line)与克兰伯恩/帕肯厄姆线(Cranbourne / Pakenham Line)的贯通,打造一条贯穿墨尔本市中心的全新直通铁路线路。项目于2017年正式动工,预计2026年建成完工。 墨尔本地铁隧道项目涵盖多个工程分包标段。随着项目推进,设计方案将持续优化并完成审批,后续将发布更新版数据集。
提供机构:
data.vic.gov.au
二维码
社区交流群
二维码
科研交流群
商业服务