Economic advantages of dynamic analysis in the early stages of mining projects

收藏
Figshare2018-07-01 更新2026-04-29 收录
下载链接:
https://figshare.com/articles/dataset/Economic_advantages_of_dynamic_analysis_in_the_early_stages_of_mining_projects/7508600
下载链接
链接失效反馈
官方服务:
资源简介:
Abstract The use of dynamic simulation is technically advantageous for the project as shown by various authors. However, is it economically advantageous in the early stages of the project (FEL1 and FEL2)? The methodology to economically evaluate the use of dynamic simulation considers the time and development cost compared with the time and cost spent to change the project in the next phase, considering changes that could be avoided with the use of dynamic simulation. Five process plant projects were evaluated, each one with an estimated CAPEX of US$ 300 million. The saved average is US$ 44,200.00 and US$ 182,400.00 for FEL 1 and FEL 2 respectively. The percentage cost savings for FEL2 (2.0%) and FEL3 (3.1%) are significant. The estimated delay avoided for FEL2 (3 weeks) and FEL3 (8 weeks) is directly related to the implementation delay, whose cost is expressively greater than the savings shown. The study concludes that the use of dynamic simulation is economically advantageous for the project.
创建时间:
2018-07-01
5,000+
优质数据集
54 个
任务类型
进入经典数据集
二维码
社区交流群

面向社区/商业的数据集话题

二维码
科研交流群

面向高校/科研机构的开源数据集话题

数据驱动未来

携手共赢发展

商业合作