Pothole Repairs
收藏data.winnipeg.ca2021-03-04 更新2025-03-26 收录
下载链接:
https://data.winnipeg.ca/Streets/Pothole-Repairs/4mat-mb3w
下载链接
链接失效反馈官方服务:
资源简介:
All pothole repairs performed by the City of Winnipeg's Public Works Department. One pothole is classified as 25 kg of fill material. Material amounts are pro-rated by length of geometry capture per entry record.
For example: If a day's record of pothole patching is attributed to Main St (1 km) and Portage Ave (0.5 km), and 375 kg of patching material was used, then Main St would be calculated as having 10 potholes filled and Portage Ave would be calculated as having 5 potholes filled.
温尼伯市公共工程部门所执行的全部坑洼修补作业。每个坑洼被定义为25公斤的填充材料。填充材料数量根据每条记录捕捉到的几何形状长度按比例计算。例如:若某日坑洼修补记录归因于Main St(1公里)和Portage Ave(0.5公里),且使用了375公斤的修补材料,则Main St的计算结果为填补了10个坑洼,而Portage Ave的计算结果为填补了5个坑洼。
提供机构:
data.winnipeg.ca



