The Mochikoshi Tailings Dam simulation is divided into three phases: the FEM Phase, the Transfer Phase, and the MPM phase. The model for the FEM Phase is an OpenSees model which captures the seismic r
Abstract The present investigation is concerned with the dynamic seismic response of subway station built in loess site by a series of shaking table tests. Firstly, according to the Bockingham π theor