five

Town of Ennis traffic calming project August - October 2020

收藏
DataONE2020-12-08 更新2025-05-03 收录
下载链接:
https://search.dataone.org/view/sha256:0c407315e00deab11052097644b399c6bfb7b90c422efb733c886ba75abe7793
下载链接
链接失效反馈
官方服务:
资源简介:
The Western Transporation Institute in partnership with the Town of Ennis and the Montana Department of Transportation conducted a temporary traffic calming project on Main Street in Ennis, MT.  The project was installed on August 3rd and was removed on October 19th. The traffic calming included the use of curb extensions, road diets, crosswalks, and restriping to simulate a reconstruction project.  The goal of the project was to improve safety for pedestrians along and crossing Main St.  Pre-installation data collection was conducted between July 24th and July 30th and post-installation data collection was conducted between September 3rd and September 8th.  Speed & volume data, pedestrian counts, and driver yielding rates data were all collected before and after the installation of the traffic calming to determine any impact on these indicators.  In addition, a community survey was created in partnership with the Town of Ennis to get feedback from community members and visitors abo...
创建时间:
2025-04-21
5,000+
优质数据集
54 个
任务类型
进入经典数据集
二维码
社区交流群

面向社区/商业的数据集话题

二维码
科研交流群

面向高校/科研机构的开源数据集话题

数据驱动未来

携手共赢发展

商业合作