Hourly flow data from hydropower facilities in CONUS
收藏DataONE2022-07-28 更新2024-06-08 收录
下载链接:
https://search.dataone.org/view/sha256:8f53e179d5827a8f242fc90d5f5771a7ff32dc8660c5b588c59c6691c6929c7b
下载链接
链接失效反馈官方服务:
资源简介:
This data resource supports Marshall & Grubert (2021). The study presents operational hydropower parameters calculated based on six years of hourly data from 158 dams, and estimates power generation in these hours based on monthly hydropower generation data reported to the Energy Information Administration (EIA). More details on calculated parameters are available in the associated manuscript. The data are distributed as a Shiny application. The application can be run locally by downloading the data package, accessed at: https://adrienne-marshall.shinyapps.io/hydropower/, or users can use the data included for their own analyses (further documentation in the readme.md further down this page).
References:
Marshall, A. M., & Grubert, E. (2022). Hydroelectricity modeling for low-carbon and no-carbon grids: Empirical operational parameters for optimization and dispatch models. Earth’s Future, n/a(n/a), e2021EF002503. https://doi.org/10.1029/2021EF002503
创建时间:
2023-12-30



