Scenarios of spare parts distribution networks with different characteristics (number of customers, average demand, etc) and spare parts producible via both Additive and Conventional Manufacturing
收藏资源简介:
Scenarios of spare parts distribution networks with different characteristics, including: Number of customers (N) Average demand of one customer (Demand1Customer) Unitary cost of Additive Manufactured spare parts purchased from a supplier (uc_AM) Unitary cost of Conventionally Manufactured spare parts purchased from a supplier (uc_CM) Unitary cost of one spare part backorder (backorder) Unitary cost of transportation (et_cen) Optimal scenario associated to that distribution centre, choosing between 10 options 1= decentralized scenario with AM spare parts 2= hybrid scenario with degree of centralization equal to 0.25 and AM spare parts 3= hybrid scenario with degree of centralization equal to 0.50 and AM spare parts 4= hybrid scenario with degree of centralization equal to 0.75 and AM spare parts 5= centralized scenario with AM spare parts 6= decentralized scenario with CM spare parts 7= hybrid scenario with degree of centralization equal to 0.25 and CM spare parts 8= hybrid scenario with degree of centralization equal to 0.50 and CM spare parts 9= hybrid scenario with degree of centralization equal to 0.75 and CM spare parts 10= centralized scenario with AM spare parts



