遇见数据集

Historic England Heritage at Risk Register 2021

收藏
ArcGIS Hub2026-01-05 更新2026-07-05 收录
官方服务:

资源简介:

Heritage at Risk provides an understanding of the overall state of England’s heritage assets. Every year Historic England updates the Heritage at Risk Register. The end result is a dynamic picture of the sites most at risk and most in need of safeguarding for the future. Assets may be assessed by using multiple methodologies so may appear multiple times. For example, a scheduled monument could be made up of archaeological remains and a standing structure. In this instance, the remains would be assessed using the archaeological risk assessment, and the structure using the buildings or structures assessment. Conservation Area information is not complete due to availability of Conservation Area spatial data. This data and its spatial depictions are purely indicative and are not a definitive representation. Users are advised to seek clarification and confirmation on risk assessments from Historic England. Historic England Open Data Hub - https://historicengland.org.uk/listing/the-list/open-data-hub/

《濒危遗产(Heritage at Risk)》项目旨在全面呈现英格兰遗产资产的整体现状。英格兰历史建筑暨遗产委员会(Historic England)每年都会更新《濒危遗产登记册(Heritage at Risk Register)》,最终产出的成果将动态展示当前风险等级最高、最亟需开展未来保护工作的遗产地概况。由于遗产资产可通过多种评估方法开展核验,因此可能会被多次纳入登记册。例如,一处备案古迹(scheduled monument)可能同时包含考古遗存与现存建筑两部分,在此情况下,考古遗存将采用考古风险评估方法进行核验,而现存建筑则采用建筑或构筑物评估方法。受保护区空间数据可获取性限制,保护区相关信息尚未完全完善。本数据集及其空间可视化成果仅为示意性内容,不具备确定性与最终法律效力。建议用户向英格兰历史建筑暨遗产委员会(Historic England)咨询并确认风险评估的相关细节。英格兰历史建筑暨遗产委员会开放数据枢纽:https://historicengland.org.uk/listing/the-list/open-data-hub/

提供机构:
Historic England
创建时间:
2021-10-14
二维码
社区交流群
二维码
科研交流群
商业服务