five

St. Clair River 2007 Hydrographic Survey

收藏
NIAID Data Ecosystem2026-05-01 收录
下载链接:
https://zenodo.org/record/10276913
下载链接
链接失效反馈
官方服务:
资源简介:
First multibeam hydrographic survey of the entire main stem of St. Clair River. 2007 Bathymetry data was collected by the US Army Corps of Engineers, Detroit District   Algonac Junction Buoy to Fort Gratiot Lt. Data were averaged into 5' x 5' grids, center placed, with limited area of 2' x 2' grid. Data were collected with a hydrographic survey system onboard the S/V WHEELER comprised of:   1) a Reson 8125 multi-beam at 455 kHz with a .5 degree beam width 2) a velocity profiler 3) GPS/POS MV positioning and heave, pitch and roll compensation   This survey data set meets the requirements of EM 1110-2-1003 1 Jan 02   Projection for all files and coordinates is NAD 83 Michigan State Plane South meters. All depths, datums and elevations are in meters.  Elevations referenced to IGLD 85. X Y Z Datum Elevation x-coordinate Michigan State Plane South Meters y-coordinate Michigan State Plane South Meters z - depth, meters, relative to low water datum Datum - Low Water Datum for point Elevation - bottom elevation of river, meters, relative to IGLD85
创建时间:
2023-12-06
5,000+
优质数据集
54 个
任务类型
进入经典数据集
二维码
社区交流群

面向社区/商业的数据集话题

二维码
科研交流群

面向高校/科研机构的开源数据集话题

数据驱动未来

携手共赢发展

商业合作