A 5 X 5 metre permanent grid was constructed and deployed at a site 200 m south east of the Great Mewstone, Plymouth, in a depth of 15-18m below chart datum. The aim of the study was to map the...
Level of Living Survey on Working Conditions aims to map different working environment conditions among employees in Norway. The survey addresses topics such as connection to the workplace, physical,