Eskom provided the BioEnergy Atlas with a set of data to describe their current and planned infrastructure: * High voltage transmission lines and substations; * Medium voltage distribution lines and substations; * Planned new transmission lines; * Planned new substations. All of these were aggregated to meso-zones (planning and analysis zones used for the Atlas) in the following way: * Distribution and transmission lines: presence or absence of lines; * Substations: count of medium voltage substations, and proximity (5km) to high voltage substations