遇见数据集

PIE LTER year 2012, 5 minute and 15 minute measurements of conductivity, water temperature in a small headwater stream draining draining a mainly forested catchment (55% forest + 19% wetland), Cart Cr., Newbury, MA.

收藏
DataONE2018-02-12 更新2024-06-25 收录
官方服务:

资源简介:

Year 2012, continuous measurements every 5 minutes during the first deployment and then 15 minutes for the remainder of the year, were made of conductivity, water temperature in Cart Creek, Newbury, MA, a small headwater stream draining a mainly forested catchment (55% forest + 19% wetland) in the Parker River watershed.

2012年,针对马萨诸塞州纽伯里的卡特溪(Cart Creek)开展连续监测:首次部署阶段采样间隔为5分钟,同年剩余时段采样间隔调整为15分钟。监测指标包括水体电导率与水温。卡特溪为帕克河(Parker River)流域内的小型源头溪流,其汇水区以林地为主,其中55%为森林用地,19%为湿地。

创建时间:
2018-02-12
二维码
社区交流群
二维码
科研交流群
商业服务