UAE6 - Wind Tunnel Tests Data - UAE6 - Sequence C - Raw Data
收藏data.gov2024-09-07 收录
数据链接:
官方服务:
资源简介:
Overview Sequences B, C, and D: Downwind Baseline (F), Downwind Low Pitch (F), Downwind High Pitch (F) This test sequence used a downwind, teetered...
概述:序列B、C及D,包含顺风基准工况(F)、顺风小俯仰工况(F)与顺风大俯仰工况(F)。本次测试序列采用顺风、铰接式(teetered)……
提供机构:
Department of Energy


