BackgroundAccurately characterizing children’s body mass index (BMI) trajectories and studying their determinants is a statistical challenge. There is a need to identify early public health measures f
BackgroundOverweight/obesity is a serious public health problem that affects a large part of the world population across all age and racial/ethnic groups. However, there has not been a meta-analysis o