five

IEEE 39-bus PMU measurements of 10 generators

收藏
IEEE2019-06-21 更新2026-04-17 收录
下载链接:
https://ieee-dataport.org/open-access/ieee-39-bus-pmu-measurements-10-generators
下载链接
链接失效反馈
官方服务:
资源简介:
The dataset contains PMU measurements of all ten generators of IEEE 39-bus transmission system model, installed at the generators terminal. The dataset was obtained by using RTDS power system simulator and GTNETx2 based PMUs, and was stored by using Synchro-measurement Application Development Framework (SADF) Matlab library. Dataset constructs in total 86.6s of simulation and 5197 PMU measurements per generator. The dataset contains PMU measurements of the following three use-cases, executed consecutively in one simulation: A. Quasi-steady-state operation, where generator G1 mechanical torque is being modulated every 200 ms with a random perturbation within ± 1 % of the nominal value. B. Quasi-steady-state operation + change in topology (2 times) caused by the applied three-phase self-cleared fault on bus B25 with permanent tripping of line B2-B25 and the delayed line B2-B25 reconnection. C. Quasi-steady-state operation + temporal perturbation caused by the three-phase self-cleared fault on bus B14. Use-case A continues with the use-case B. In the use-case B, a fault is applied, leading to line B2-B25 permanent disconnection. This results in the topology change. Moreover, approximately 37 s after the fault, the line B2-B25 is reconnected to restore the initial topology (as in the use-case A). Finally, in use-case C, the quasi-steady-state conditions, as in use-case A, are followed by a three-phase 80 ms self-cleared fault on bus B1.
提供机构:
EWI, TU Delft
创建时间:
2019-06-21
5,000+
优质数据集
54 个
任务类型
进入经典数据集
二维码
社区交流群

面向社区/商业的数据集话题

二维码
科研交流群

面向高校/科研机构的开源数据集话题

数据驱动未来

携手共赢发展

商业合作