Stony Creek Floodplain Risk Management Plan
收藏Research Data Australia2025-12-20 收录
下载链接:
https://researchdata.edu.au/stony-creek-floodplain-management-plan/3816166
下载链接
链接失效反馈官方服务:
资源简介:
This Floodplain Risk Management Study investigates what can be done to reduce or\r\nmanage the effects of flooding in the catchment. The Floodplain Risk Management Plan\r\nrecommends a mix of strategies to manage the risks of flooding.\r\nUsing the merits-based approach advocated in the NSW State Government’s Floodplain\r\nDevelopment Manual (2005) and in consultation with the community, Council and state\r\nagency stakeholders, a number of potential options for the management of flooding were\r\nidentified.\r\nThese options included:\r\n• flood modification measures;\r\n• property modification measures; and\r\n• emergency response measures.\r\nAn extensive list of options was assessed against a range of criteria (technical, economic,\r\nenvironmental and social). Hydraulic modelling of some of the flood modification options\r\nwas undertaken to provide a comprehensive analysis of those options that would involve\r\nsignificant capital expenditure.
本洪泛区风险管理研究(Floodplain Risk Management Study)旨在探究可采取何种措施以减轻或管控流域内洪水灾害的影响。本次洪泛区风险管理规划(Floodplain Risk Management Plan)提出了一套组合策略,用以管控洪水风险。
研究采用新南威尔士州(New South Wales)州政府2005年版《洪泛区开发手册》(Floodplain Development Manual)中倡导的基于优劣评估的方法,并联合社区、地方议会及州级机构利益相关方开展磋商,最终确定了多项洪水风险管理的潜在方案。
上述方案涵盖:
• 洪水调控措施;
• 财产防洪改造措施;
• 应急响应措施。
研究针对上述一系列方案,依据技术、经济、环境与社会等多维度评估标准开展了全面评估。针对部分涉及大额资本支出的洪水调控方案,研究开展了水力模型模拟(Hydraulic modelling),以对其展开全面分析。
提供机构:
data.nsw.gov.au



