遇见数据集

Simple download service (Atom) of the dataset: Priority works on rivers listed in list 2 of the Rhine-Meuse Basin (period 2019-2027)

收藏
data.europa2024-06-25 收录
官方服务:

资源简介:

The priority programme for actions to restore the ecological continuity of the Rhine-Meuse basin Restoration of the ecological continuity of watercourses is necessary to achieve the objectives of good environmental status of watercourses, set out in the European Water Framework Directive and set out in the Master Plans for Water Management (SDAGE). A first programme of actions had been initiated in 2010 by the Ministry responsible for ecology, but difficulties had emerged which delayed its implementation. In order to overcome them, a new action plan for a calm policy to restore the ecological continuity of rivers was adopted in June 2018. One of the actions of this plan is to define, in a consistent manner, shared priorities for interventions in order to effectively pursue the restoration of ecological continuity, in favour of the good status of rivers and the recovery of biodiversity. In the Rhine-Meuse basin, the restoration of ecological continuity is a large-scale project that requires time and means, both financial and human. Indeed, approximately 5.146 km of watercourses, or about 17 % of the total linear, were listed in list 2 in 2012/2013, i.e. a number of works to be brought into compliance within this framework estimated at 16421. As a result of the continuous improvement of knowledge, a total of 13,050 works in the Rhine-Meuse basin of which approximately 4 400 are located on rivers listed in list 2, i.e. 1/3 of the structures in the basin2, were identified in the Flow Barriers (ROE) at the beginning of 2019. It is more than 2.5 times the number of books in List 2 that was raised in 2012 when the classifications were revised, and not all of the works have yet been listed since the ROE feed is progressive. Of these, not all will have to develop or modify, but action remains necessary for a large number of them. Finally, there are large disparities between the territories in the number of books to be processed, with the departments of Vosges, Bas-Rhin and Haut-Rhin concentrating the majority of them. In view of this context, it was therefore decided to draw up, at the level of the Rhine-Meuse basin, a list of priority works requiring work (equipment, fitting-out, erasure, etc.). This prioritisation strategy has to first identify priority areas (priority watercourses for the protection of amphihalin migratory fish, biological reservoirs identified in the SDAGE, etc.) and then, on these watercourses or parts of watercourses designated as priorities, to identify the most impacting works (works influencing a significant linear, blocking access to spawning grounds, etc.). In 2018/2019, the departmental directorates of the territories, the French Agency for Biodiversity, the Agence de l’eau Rhin-Meuse and the Regional Directorate for Environment, Planning and Housing worked together to identify the most relevant actions in terms of ecological gain or feasibility. These departmental lists of priority works have been validated by MISEN (Missions Inter-Services for Water and Nature) after consultation with stakeholders at departmental level. These lists, compiled at the basin level, formed the programme for prioritising interventions in the restoration of the ecological continuity of the rivers listed in list 2 in the Rhine-Meuse basin. In order to finalise the consultation with all water users, this programme was presented to the basin bodies (planning committee, basin committee) which gave a favourable opinion. The programme was validated on 16 January 2020 by the Rhine-Meuse Basin Technical Secretariat, mandated by the Basin Committee. In total, the Rhin-Meuse prioritisation programme has 514 prioritised works over the period 2019-2027: — 200 works in a 2019-2021 list to be implemented under the Territorialised Operational Action Plans (TAPs) 2019-2021; — 314 works in a 2022-2027 list, the implementation of which will be backed by the SDAGE Programme of Measures for the period 2022-2027. Legally, the obligation to ensure the movement of fish and the adequate transport of sediments over all rivers listed in List 2 is maintained (Article L.214-17 of the Environmental Code). The prioritisation programme tends to avoid overruns or to reduce actual delays on the basis of a principle of reality. It must make it possible to move forward more effectively. Name of the dataset: ROE_PRIOR_LISTE2_[2019]_P_BRM.shp

莱茵-默兹流域生态连通性修复行动优先级计划 修复水系的生态连通性,是实现《欧洲水框架指令》及《水资源管理总体规划(SDAGE)》中设定的水系良好环境状态目标的必要前提。 法国生态主管部门曾于2010年启动首个行动方案,但因出现诸多困难导致实施进程受阻。为破解这些难题,2018年6月通过了一项旨在稳妥推进河流生态连通性修复的新行动计划。 该计划的核心行动之一,是以统一规范的方式明确共同的干预优先级,以有效推进生态连通性修复,助力河流生态状况改善与生物多样性恢复。 在莱茵-默兹流域,生态连通性修复属于大型工程,需要投入充足的时间、资金与人力资源。 2012/2013年,约5146千米的水系(占总水系长度的17%)被纳入名录2,该框架下需完成合规改造的工程共计16421项。随着认知水平的持续提升,截至2019年初,莱茵-默兹流域共在流动障碍(Flow Barriers, ROE)数据库中识别出13050处设施,其中约4400处位于名录2所列河流之上,占流域内相关设施总量的三分之一(注2)。该数量是2012年名录修订时上报的名录2相关设施数量的2.5倍以上,且由于ROE数据库仍在持续更新,并非所有设施均已被收录。其中并非所有设施都需要进行新建或改造,但仍有大量设施需采取整治行动。此外,各辖区需处理的设施数量存在显著差异,孚日省(Vosges)、下莱茵省(Bas-Rhin)与上莱茵省(Haut-Rhin)集中了绝大多数待处理设施。 鉴于上述背景,莱茵-默兹流域管理层面决定编制一份需实施整治的优先级设施清单(涵盖设备加装、改造、拆除等场景)。该优先级制定策略需先明确重点区域:包括用于保护溯河洄游鱼类的优先水系、《SDAGE》划定的生物栖息地等;随后在被指定为优先的水系或其区段内,识别出影响最为显著的设施——例如对较长水系段产生影响、阻断鱼类产卵场通行的设施等。 2018至2019年间,各辖区部门主管局、法国生物多样性署、莱茵-默兹水资源署以及环境、规划与住房区域局通力协作,从生态效益与实施可行性角度筛选出最具价值的行动方案。经与辖区层面利益相关方磋商后,各辖区的优先级设施清单已通过跨部门水与自然任务团(MISEN, Missions Inter-Services for Water and Nature)的审核验证。 这些汇总至流域层面的清单共同构成了莱茵-默兹流域名录2所列河流生态连通性修复干预优先级计划。为完成与所有用水主体的最终磋商,该计划被提交至流域机构(规划委员会、流域委员会)审议并获得通过。2020年1月16日,经流域委员会授权的莱茵-默兹流域技术秘书处对该计划予以正式核准。 总体而言,莱茵-默兹流域优先级计划共包含2019至2027年间需实施的514项优先级整治工程: — 200项纳入2019-2021年清单,将通过《2019-2021年属地化行动实施方案(Territorialised Operational Action Plans, TAPs)》推进落地; — 314项纳入2022-2027年清单,其实施将依托《2022-2027年SDAGE措施计划》予以保障。 从法律层面而言,保障名录2所列河流的鱼类通行与泥沙正常输运的义务仍需履行(依据《环境法典》第L.214-17条)。本优先级计划以务实原则为基础,旨在避免超支或缩减实际工期,从而更高效地推进修复工作。 数据集名称:ROE_PRIOR_LISTE2_[2019]_P_BRM.shp

二维码
社区交流群
二维码
科研交流群
商业服务