Archaeological Field Report of the S-74/S-19 Bridge Replacement, Aiken County
收藏DataONE2013-09-10 更新2024-06-27 收录
下载链接:
https://search.dataone.org/view/doi:10.6067:XCV88053VH_meta$v=1378827420276
下载链接
链接失效反馈官方服务:
资源简介:
"The project involved the replacement of the existing bridge with a reinforced concrete flat slab bridge. The parcel of new right-of-way measure 335 feet long by 42 feet."
创建时间:
2013-09-10



